quartz-scheduler

Quartz Scheduler not stopping after shutdown

给你一囗甜甜゛ 提交于 2019-12-18 12:29:26
问题 I'm using the currently latest quartz 1.8.3 on jboss 4.0.5. The quartz jobs are persistent and saved into a local database. When I call the shutdown or standby method on the executing quartz scheduler object jobs still continue to execute by the scheduler, only that the jobs state is empty and the execution fails. I would expect (at least according to quartz API documentation) that when I shutdown or make the scheduler standby, that jobs previously scheduled into the database will not be

Testing Quartz CronTrigger trigger

拥有回忆 提交于 2019-12-18 12:21:19
问题 Assuming that I have a CronTriggerBean similar to <bean id="midMonthCronTrigger" class="org.springframework.scheduling.quartz.CronTriggerBean"> <property name="jobDetail" ref="reminderJobDetail" /> <property name="cronExpression" value="0 0 6 15W * ?" /> </bean> What is the best way to test that this bean will actually trigger at its specified date, i.e. on the weekday closest to the 15th of each month at 6 AM? Update : This is supposed to be an unit test, so I'm not going to fire up a VM or

Grails clustering quartz jobs sample code and config desired

核能气质少年 提交于 2019-12-18 11:57:50
问题 I am using the quartz plugin with Grails 1.3.7. I have a need to load balance/cluster a server app that uses quartz jobs. Apparently this is supported but I am finding that all the google search results and links within documents are broken. I've found some raw Java examples but I would assume Grails has a more grailsy way to do this. All I need is a simple example to use as a template. I understand I need to somehow enable quartz to use JDBC to store the jobs and manage locking. I think a

How to scale the Quartz scheduler?

老子叫甜甜 提交于 2019-12-18 11:56:13
问题 I plan to use the Quartz scheduler as I read many good opinions about it. My problem is as follows: I will have thousands of triggers living in the system at any given time. Most of the triggers will fire just one event and die. In addition, it is very likely I will have to cancel many jobs after their allocation (based on new input). Can Quartz scale to this? Which JobStore is recommended? I planned to use the JDBC one over mysql. Added Information : My jobs will either send an e-mail or

Quartz : Memory Leak?

回眸只為那壹抹淺笑 提交于 2019-12-18 08:39:24
问题 I am using Quartz to run a job every hour. The servlet is running on Tomcat and I am using the ServletConextListener to listen for when the context is destroyed. When I shut down tomcat, I get the message: "appears to have started a thread named [MyScheduler_Worker-1] but has failed to stop it". But later I see this message: "[DEBUG] 28 Sep 11:45:26.671 AM MyScheduler_Worker-1 [org.quartz.simpl.SimpleThreadPool] WorkerThread is shut down." So is it safe to assume that there is no memory leak

compare Cron Expression with current time

≡放荡痞女 提交于 2019-12-18 07:05:38
问题 I am designing a scheduler and using quartz library. I want to check whether cron expression time refer to the time in the future, Otherwise trigger won't be executed at all. Is there any way of comparing cron expression time with current time in java. 回答1: Something to consider is that a standard valid cron expression will always refer to a valid time in the future. The one caveat to this is that Quartz cron expressions may include an optional year field, which could be in the past as well

Quartz current executing job when Tomcat is killed

两盒软妹~` 提交于 2019-12-18 04:53:08
问题 Something i am not clear on. Say i have jobs randomly scheduled throughout the day and each job takes 30 minutes to run. Say i have five of these jobs running and Tomcat gets killed. Do the jobs restart when i start Tomcat with my application, or are the currently running jobs lost because they already fired? 回答1: Short answer, by default, currently running Jobs are considered fired and are not recovered .. but you can set requestRecovery property when you build a Job (JobDetail) to tell

Java Quartz-Scheduler across TimeZone

情到浓时终转凉″ 提交于 2019-12-18 03:35:14
问题 My server runs on Europe/Rome timezone -and this one is the default tz on the server-, I need to schedule jobs according the user's timezone, so, if a user, living on Pacific/Honolulu timezone, schedules a CronTrigger that fires every day at 22:00pm for his region of the Earth I have found this solution: CronTrigger trigger = newTrigger() .withIdentity("name", "group") .withSchedule( cronSchedule("0 0 22 ? * *").inTimeZone(TimeZone.getTimeZone("Pacific/Honolulu")) ) .startNow() .build(); On

quartz: preventing concurrent instances of a job in jobs.xml

喜夏-厌秋 提交于 2019-12-17 21:41:41
问题 This should be really easy. I'm using Quartz running under Apache Tomcat 6.0.18, and I have a jobs.xml file which sets up my scheduled job that runs every minute. What I would like to do, is if the job is still running when the next trigger time rolls around, I don't want to start a new job, so I can let the old instance complete. Is there a way to specify this in jobs.xml (prevent concurrent instances)? If not, is there a way I can share access to an in-memory singleton within my application

How to do “sequential” Job Scheduling (Quartz?)

我怕爱的太早我们不能终老 提交于 2019-12-17 18:52:38
问题 I'm making use of Quartz Scheduling and there are 2 jobs. First Job is performing the tasks for around 2 minutes and the Second one is to be setup for Cleaning Operations of Temporary Files. So, I need to setup the Schedule to work in a way that after the first job is executed/finished performing tasks I need to do the cleaning operations with the help of Second Job. Considering the Example 9 - Job Listeners under Quartz 2.1.x which states that we can define a method named jobWasExecuted( _,