HRBUST 1004 The Triangle

匿名 (未验证) 提交于 2019-12-03 00:21:02

The Triangle
Time Limit: 1000 MSMemory Limit: 65536 K
Total Submit: 1944(903 users)Total Accepted: 1077(834 users)

No
Description
7 3   8 8   1   0 2   7   4   4 4   5   2   6   5  (Figure 1)

Input

Your program is to read from standard input.

For each test case, the first line contains one integer N: the number of rows in the triangle. The following N lines describe the data of the triangle. The number of rows in the triangle is > 1 but <= 100. The numbers in the triangle, all integers, are between 0 and 99.

Process to the end of file.

Output

For each test case, your program is to write to standard output. The highest sum is written as an integer.

Sample Input

5
7
3 8

2 7 4 4
4 5 2 6 5

Sample Output

30

这个题目是动态规划里面最简单的一类题目了,就是一个很典型数塔问题,我们从数塔的最下方向上方不断进行加法运算就好了,状态转移方程是dp[i-1][j]+=max(dp[i][j],dp[i][j+1]);好了,以下贴上代码:

#include<iostream> #include<cstdio> using namespace std;  const int MAXN=1005; int dp[MAXN][MAXN];  int main(){     int n;     while(cin>>n){         int i,j;         for(int i=0;i<n;i++){             for(int j=0;j<=i;j++){                 cin>>dp[i][j];             }         }         for(int i=n-1;i>=1;i--){             for(int j=0;j<i;j++){                 dp[i-1][j]+=max(dp[i][j],dp[i][j+1]);             }         }         cout<<dp[0][0]<<endl;     }     return 0; } 

标签
易学教程内所有资源均来自网络或用户发布的内容,如有违反法律规定的内容欢迎反馈
该文章没有解决你所遇到的问题?点击提问,说说你的问题,让更多的人一起探讨吧!