问题
suppose i have a sequence, called TEST_SEQ what would be the correct way of selecting its next value ? this does not work:
select next value for TEST_SEQ
probably because it expects a "FROM" clause. looking at HSQLDialect.getSequenceNextValString() in hibernate i see this:
"select next value for " + sequenceName + " from dual_" + sequenceName
which in my case would result in something like:
select next value for TEST_SEQ from dual_TEST_SEQ
which does not work for 2.0.0-rc8 (i only assume this works in pre-2.0 versions - havent verified) I've come across a solution that involves creating a simple table with 1 row called DUAL, in which case this will work (oracle style):
select next value for TEST_SEQ from DUAL
but hsqldb does not come with this table out of the box, and im not sure how i can get hibernate to generate such a table on "first boot".
Im thinking there has to be a way to get the next value for a sequence out of the box and im just missing it. any ideas ?
回答1:
suppose i have a sequence, called TEST_SEQ what would be the correct way of selecting its next value ?
While the documentation says:
The next value for a sequence can be included in SELECT, INSERT and UPDATE statements as in the following example:
SELECT [...,] NEXT VALUE FOR <sequencename> [, ...] FROM <tablename>;
the "correct" way (because simpler, because not involving a table like a dumb DUAL table that HSQLDB doesn't have) would be:
call NEXT VALUE FOR [sequence_name];
This appeared in 1.7.2 and this his actually how Hibernate handles sequences in the HSQLDialect
of "recent" versions of Hibernate Core (see HHH-2839).
And indeed, this is what I see in the HSQLDialect
of hibernate-core-3.3.0.SP1.jar
:
public String getSequenceNextValString(String sequenceName) {
return "call next value for " + sequenceName;
}
So my advice is: upgrade to a newer version of Hibernate, you are very likely using Hibernate Core 3.2.5 or prior.
回答2:
Apparently if you run
SET DATABASE SQL SYNTAX PGS
(PGS standing for Postgres)
then you can query it using standard Postgres syntax like select nextval('sequence_name')
http://hsqldb.org/doc/guide/dbproperties-chapt.html
Also note that if you once do this , typical HSQLDB sequence like call NEXT VALUE FOR SEQUENCE_NAME
will no longer work.
来源:https://stackoverflow.com/questions/2340037/correct-way-to-select-next-sequence-value-in-hsqldb-2-0-0-rc8