Running Jenkins parallel tasks sequentially

一曲冷凌霜 提交于 2019-12-12 23:16:33

问题


I'm writing a new Jenkins pipeline and have a set of steps that I would eventually like to run in parallel. But while I'm developing this pipeline I'd like to force it to run sequentially. I'm not seeing any way to specify the number of threads a parallel step uses or anything like that. Here is the basic code so far:

node('x') {
    stage('cleanup'){
        def cleanupScripts = [:]
        cleanupScripts[1] = { sh(script: "cleanup1.sh") }
        cleanupScripts[2] = { sh(script: "cleanup2.sh") }
        cleanupScripts[3] = { sh(script: "cleanup3.sh") }
        cleanupScripts[4] = { sh(script: "cleanup4.sh") }
        parallel cleanupScripts
    }
}

I'd like to be able to run those shell scripts sequentially without changing a lot of code.


回答1:


Instead of parallel cleanupScripts you can use like this:

cleanupScripts.each{ key, value ->
    value()
}



回答2:


I don't know any way run step in parallel in jenkins. You can run parallel jobs in the same node or in different nodes.

Running parallel jobs

parallel (
// job 1, 2 and 3 will be scheduled in parallel.
{ build("job1") },
{ build("job2") },
{ build("job3") }
)

You can make a job for each cleanup*.sh and call these jobs like above.

A more simple approach is use parallel command

Or simplest

clenaup1.sh &! clenaup3.sh &! clenaup4.sh &! ...


来源:https://stackoverflow.com/questions/43639498/running-jenkins-parallel-tasks-sequentially

易学教程内所有资源均来自网络或用户发布的内容,如有违反法律规定的内容欢迎反馈
该文章没有解决你所遇到的问题?点击提问,说说你的问题,让更多的人一起探讨吧!