protractor: onPrepare for different test suites

纵然是瞬间 提交于 2019-12-05 07:41:16

As far as I understand, you need a place for suite-specific preparations.

This is what jasmine can help you with.

For jasmine 2.1 and above, there are built-in beforeAll and afterAll notations:

The beforeAll function is called only once before all the specs in describe are run, and the afterAll function is called after all specs finish. These functions can be used to speed up test suites with expensive setup and teardown.

If you are on an older jasmine version, use a separate jasmine-beforeAll package.

易学教程内所有资源均来自网络或用户发布的内容,如有违反法律规定的内容欢迎反馈
该文章没有解决你所遇到的问题?点击提问,说说你的问题,让更多的人一起探讨吧!