Failing to merge date on Eclipselink

时光毁灭记忆、已成空白 提交于 2019-12-04 13:08:30

Does the merge work on other (non-Calendar) attributes?

Check if the Calendar of the object being merged is the same instance (==) as the managed objects Calendar.

You might need to set the persistence unit property, "eclipselink.temporal.mutable"="true" (or use @Mutable on the mapping)

or ensure that a new Calendar instance is set, instead of modifying the existing one.

易学教程内所有资源均来自网络或用户发布的内容,如有违反法律规定的内容欢迎反馈
该文章没有解决你所遇到的问题?点击提问,说说你的问题,让更多的人一起探讨吧!