As a novice in practicing test-driven development, I often end up in a quandary as to how to unit test persistence to a database.
I know that technically this would
You do the unit testing by mocking out the database connection. This way, you can build scenarios where specific queries in the flow of a method call succeed or fail. I usually build my mock expectations so that the actual query text is ignored, because I really want to test the fault tolerance of the method and how it handles itself -- the specifics of the SQL are irrelevant to that end.
Obviously this means your test won't actually verify that the method works, because the SQL may be wrong. This is where integration tests kick in. For that, I expect someone else will have a more thorough answer, as I'm just beginning to get to grips with those myself.