At an earlier workplace, we inherited a legacy project, which partially had been outsorced earlier. The main app was Java, the outsourced part was a native C library. Once I had a look at the C source files. I listed the contents of the directory. There were several source files over 200K in size. The biggest C file was 600 Kbytes.
Thank God I never had to actually touch them :-)